Estimation of Minimum Principal Stress from an Extended Leak-off Test Onboard the Chikyu Drilling Vessel and Suggestions for Future Test Procedures
Abstract. No abstract available.
doi:10.2204/iodp.sd.6.06.2008
Abstract. No abstract available.
doi:10.2204/iodp.sd.6.06.2008