Articles | Volume 24
Sci. Dril., 24, 79–86, 2018
https://doi.org/10.5194/sd-24-79-2018
Sci. Dril., 24, 79–86, 2018
https://doi.org/10.5194/sd-24-79-2018
Workshop report
22 Oct 2018
Workshop report | 22 Oct 2018

The Newberry Deep Drilling Project (NDDP) workshop

Alain Bonneville et al.

Viewed

Total article views: 3,248 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
2,747 445 56 3,248 57 70
  • HTML: 2,747
  • PDF: 445
  • XML: 56
  • Total: 3,248
  • BibTeX: 57
  • EndNote: 70
Views and downloads (calculated since 22 Oct 2018)
Cumulative views and downloads (calculated since 22 Oct 2018)

Viewed (geographical distribution)

Total article views: 2,394 (including HTML, PDF, and XML) Thereof 2,254 with geography defined and 140 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 

Cited

Latest update: 22 May 2022
Download
Short summary
The Newberry Deep Drilling Project (NDDP) will be located on the Newberry Volcano, Oregon, USA, at an idle geothermal exploration well, NWG 46-16, drilled in 2008, 3500 m deep and 340–374 °C at bottom, which will be deepened another 1000 to 1300 m to reach 500 °C. The main goals are to test EGS in the ductile/brittle transition zone and to test technology for drilling, well completion, and geophysical monitoring in a very high temperature environment.